網(wǎng)站首頁技術(shù)中心 > CD-800 Dicing Machine               Instruction
產(chǎn)品目錄
CD-800 Dicing Machine               Instruction
更新時間:2013-07-29 點擊量:3871

This type of machine is specialized in vegetable and cormcutting. It is easily operating for woman. It is also the necessary facility for restaurants and second processing factories. Instantaneous ability is above 15 people. This machine will let you have satisfied feeling.

 

A.   Processing material

    Potatoes, carrots, melons, bamboos, onions, apples, vegetables and so on.

 

B. Processing dimension:

(standard)

               H                 10. 15. 20mm cubes or bars.

L              T            (special dimension)

                             3-20mm cubes or bars.

 

C. Capacity

15/mm cubes;    1000kg/hr

 

D.   Voltage

3 phase / 415V, 50Hz / 4P / 0.75KW

(each countries has different voltage connection)

E.   Machine dimension & weight

L 800×W 700×H 1260mm

 

F. Cutting work outline

    Connecting “ON” switch, add little water when machine is running and put suitable amount of material to the machine. (Material diameter under 8/cm). Leaf blade will turn over the material to the fixed thickness of the place of flate cutter. And crosscut cutter will cut the bars into cubes and flow down to the machine after round cutter cuts material into bars. Easily operate, and processing material is clean and delicacy.

 

 

 

 

 

 

 

 

 

 

 

G. Voltage connection

    Power: 3 phase / 415V / 4P / 0.75KW. Connect power cord (red, black, white) when use the machine. Then connect (green) line to insurance after that start to operating.

 B

 

 

 

 

 

               A

 

(1) The power line A connected to power supply. (Attention the    motor shift)

(Attention 4 power lines, green for the grounding line.)

(2) Water pipeline will be connected B, then the installation is completed.

 

 

 

H.   Installing location

    Consider whether the water drains unimpededly or not when install the machine.

 

I.   Watch out the machine running

    Make sure there are no foreign objects on the entrance of the machine and inside of the leaf blade after connecting voltage to avoid the cutter broken while the machine running. Make sure the direction of leaf blade is correct, rith circum gyratoin (clock-wise).

 

J. Method of adjusting thickness of flate cutting

The standard allocation method as follows: (if cut cube is formed by three Cutter)

(1) The first knife (cutting thickness): Plane broadswords Z.     (Adjustable by cutting thickness)

(2)   The second knife (cutting width): Circular knife Group Y.

  5mmP (space): 5mm

 10mmP (space): 10mm

 15mmP (space): 15mm

 20mmP (space): 20mm

 

(3)   The third knife (cut length): transverse plane knife Group.

5mm uses 15 knife group

10mm uses 8 knife group

15mm uses 6 knife group

20mm uses 4 knife group

 

K.   Method of adjusting aluminum fence

Aluminum fence feeds material to crosscut cutter when round cutter cuts the material. This is why the sharp place of aluminum fence has to get close to the cushion of gap of round cutter or the dimension of aluminum fence marks on the bottom right side.

 

L. Round cutter discharging

Round cutter dimension drawing

Round cutter dimension

 

 

Standard (mm)

P: 10

P: 15

P: 20

Special (mm)

P: 3-20

(1) Avert black screw of fixed eccentric axis.

(2) Pull down the fixed bolt of round cutter eccentric axis. Then round cutter can be discharged.

(3) Fix the u-shape spanner on the round cutter set, then loosen sexangular on the round cutter axis (two sides of 24m/m spanner), then it can be taken out.

 

 

 

M. Crosscut cutter discharge

Crosscut cubes round piece

5m/m uses 21 pieces

10m/m uses 8 pieces

15m/m uses 6 pieces

20m/m uses 4 pieces

(1) Fix u-shape spanner on the fixed crosscut cutter set when discharge crosscut cutter. Then loosen sexangular screw (24m/m spanner), then it can be taken out.

 

N. Daily cleansing

    Clean the machine after finish the jobs. Run the machine while operating, then wash it by flush water to clean the leavings.

O.   Standard by-products:

Spanner         10, 19, 24………….3

Screwdriver (-), (+)……….……………2

U-shape spanner                 1 PCS

Lubricant oil                    1

Tool box                       1 box

97精品国产一区二区三区| 亲胸揉屁股膜下刺激视频| 亚洲欧美熟妇综合久久久久| 中文字幕一区二区精品区| 挺进绝色校花的紧窄小肉| 人妻体内射精一区二区三区| 亚洲av熟女国产一区二区三区| 麻豆av一区二区三区久久 | 亚洲H在线播放在线观看H| 夫妻那些事全集免费观看电视剧 | 欧美大浪妇猛交饥渴大叫| 国产成人成人a片在线乱码视频| 老公一到晚上就日不停| 美女高潮黄又色高清视频免费| 国产精品Ⅴ无码大片在线看| 精品国产日韩欧美一区二区三区| 一本大道久久东京热无码av | 久久成人国产精品| 伊人www22综合色| 无套内谢少妇毛片a片软件 | 艳妇荡岳丰满交换做爰| 侯府荡女h叶凝欢h| 精品人妻一区二区三区| 国产SUV精品一区二区五| 久久国产精品免费一区| 18岁禁止入内| 欧美激情一区二区三区| 欧美成人精品一区二区免费| 亚洲av无码专区亚洲av桃| 精东影视传媒MV国产剧能看不 | 99精品国产综合久久久久五月天| 无码精品a∨在线观看十八禁| 国产精品后入内射日本在线观看| 狼人无码精华av午夜精品| 亚洲b2b网站| 纯肉高h啪短文校园| 国产偷国产偷亚洲清高| 两个人免费完整版在线观看视频 | 免费网站看v片在线18禁无码| 美女100%裸体无遮挡| 精品亚洲a∨无码一区二区三区 |